Our Room 2 has what was the houses bathroom as it’s en-suite. We are closing the last of March and are having the old bathroom suite taken out and replaced with a new one. New floor, radiator, shower screen etc are also being fitted.
During the same week new carpets are also going down in the lounge and breakfast room.